Last week the fireplace was finished. The guy wanted something to do since he can’t work on the stone outside, so he worked a couple days inside. It looks really good! We went out on Saturday to see how things were coming along. The guy doing the showers was supposed to be there Friday and Saturday and should have been almost done by the time we got there. But he didn’t even get started, and I doubt he is even there today. So the fireplace is about all that has changed on the house in two weeks.
Today, Wade, Troy and Zach are putting down the wood floor. So we will see what it looks like later this week when we go visit. I’m getting really excited because we are getting down to the last big things. After the floor is down, we can get the cabinets installed and our carpet as well (as long as the showers get done this week). We are still looking at early March to be completed, but that’s not too far away!